IAC logo
IAC Assessment: NC0538
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0538
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2015
Principal Product Motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 270,000
Annual Production 1,800 Pieces
Production Hrs. Annual 4,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,360 4,424,488 kWh $0.06
Electricity Demand $46,406 12,542 kW-months/year $3.70
Natural Gas $20,387 1,995 MMBtu $10.22
TOTAL ENERGY COSTS $343,153
RECOMMENDED SAVINGS* $41,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,252
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,825
Cost:
$50,000
$58,742 939,872 $10,433 2,820 $(-51,350) (-5,000) - - - - $58,742
939,872
kWh
$10,433
2,820
kW-months/year
$(-51,350)
(-5,000)
MMBtu
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,806
Cost:
$21,000
$5,729 91,667 $4,070 1,100 $(-3,993) (-391) - - - - $5,729
91,667
kWh
$4,070
1,100
kW-months/year
$(-3,993)
(-391)
MMBtu
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,306
Cost:
$1,700
$2,306 36,900 - - - - - - - - $2,306
36,900
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,255
Cost:
$20,000
$6,155 98,472 $1,100 297 - - - - - - $6,155
98,472
kWh
$1,100
297
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$828
Cost:
$100
$839 13,428 $149 41 - - $(-100) - $(-60) - $839
13,428
kWh
$149
41
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-60)
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,230
Cost:
$1,875
$4,050 64,800 $719 194 - - - - $461 - $4,050
64,800
kWh
$719
194
kW-months/year
-
-
MMBtu
-
-
$
$461
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$424
Cost:
$1,767
$424 6,763 - - - - - - - - $424
6,763
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,483
Cost:
$4,256
$1,259 20,148 $224 60 - - - - - - $1,259
20,148
kWh
$224
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,157
Cost:
$100,698
$79,504 1,272,050 $16,695 4,512 $(-55,343) (-5,391) $(-100) - $401 - $79,504
1,272,050
kWh
$16,695
4,512
kW-months/year
$(-55,343)
(-5,391)
MMBtu
$(-100)
-
$
$401
-
$
TOTAL IMPLEMENTED Savings:
$1,252
Cost:
$1,867
$1,263 20,191 $149 41 - - $(-100) - $(-60) - $1,263
20,191
kWh
$149
41
kW-months/year
-
-
MMBtu
$(-100)
-
$
$(-60)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost