IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,095

matching recommendations
Reset
NAICS 335 Electrical Equipment, Appliance, and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0449 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,300 $10,168 Implemented
NC0449 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $7,288 $37,820 Not Implemented
NC0449 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,027 $6,500 Not Implemented
NC0449 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,521 $3,200 Not Implemented
OK0826 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,497 $27,016 Not Implemented
OK0826 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,910 $106,879 Not Implemented
OK0826 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,061 $38,900 Not Implemented
OK0826 # 04 Y:2012 04 2012 COVER OPEN TANKS $1,576 $0 Not Implemented
OK0826 # 05 Y:2012 05 2012 REDUCE EXCESSIVE BOILER BLOWDOWN $13,280 $31,040 Not Implemented
OK0826 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $4,630 $4,000 Not Implemented
OK0826 # 07 Y:2012 07 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $20,532 $9,400 Not Implemented
BD0410 # 01 Y:2012 01 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,500 $5,500 Not Implemented
BD0410 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,850 $20 Not Implemented
BD0410 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $821 $10,000 Not Implemented
BD0410 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $4,755 $4,050 Not Implemented
BD0410 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $3,095 $1,000 Not Implemented
BD0410 # 06 Y:2012 06 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,832 $4,900 Not Implemented
BD0410 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $2,094 $2,025 Not Implemented
BD0410 # 08 Y:2012 08 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,907 $500 Not Implemented
BD0410 # 09 Y:2012 09 2012 INSTALL AUTOMATIC STACK DAMPER $1,223 $1,750 Not Implemented
MI0215 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $15,517 $8,000 Implemented
MI0215 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,090 $1,320 Not Implemented
MI0215 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,007 $21,070 Not Implemented
MI0215 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,640 $12,200 Not Implemented
MI0215 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,815 $1,300 Implemented