Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,095
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0532 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,119 | $2,000 | Implemented |
SU0532 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,953 | $8,568 | Implemented |
SU0532 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $827 | $580 | Implemented |
SU0532 # 08 Y:2023 | 08 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,165 | $0 | Not Implemented |
SU0532 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24 | $100 | Implemented |
SU0532 # 10 Y:2023 | 10 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $728 | $0 | Not Implemented |
TT0298 # 01 Y:2023 | 01 | 2023 | MINIMIZE WATER USAGE | $54,343 | $42,000 | n/a |
TT0298 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,300 | $196,225 | n/a |
TT0298 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $26,893 | $45,000 | n/a |
TT0298 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $26,094 | $85,000 | n/a |
TT0298 # 05 Y:2023 | 05 | 2023 | ISOLATE HOT OR COLD EQUIPMENT | $25,424 | $60,000 | n/a |
TT0298 # 06 Y:2023 | 06 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $20,290 | $61,440 | n/a |
TT0298 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,545 | $31,800 | n/a |
TT0298 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,325 | $22,800 | n/a |
TT0298 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,862 | $9,000 | n/a |
TT0298 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $13,500 | n/a |
TT0298 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,983 | $9,000 | n/a |
TT0298 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $2,010 | n/a |
TT0298 # 13 Y:2023 | 13 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,689 | $9,000 | n/a |
IC0284 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,480 | $3,669 | Implemented |
IC0284 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,864 | $0 | Implemented |
IC0284 # 03 Y:2023 | 03 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $445 | $0 | Implemented |
IC0284 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $556 | $897 | Implemented |
IC0284 # 05 Y:2023 | 05 | 2023 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $152,337 | $14,315 | Not Implemented |
IC0284 # 06 Y:2023 | 06 | 2023 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $192,600 | $121,203 | Implemented |