Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
132
matching recommendationsNAICS | 335 | Electrical Equipment, Appliance, and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0179 # 06 Y:2023 | 06 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $26,133 | $46,106 | Not Implemented |
IP0179 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,534 | $182 | Not Implemented |
IP0179 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $814 | $9 | Not Implemented |
IP0179 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,788 | $345 | Not Implemented |
IP0179 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,855 | $0 | Not Implemented |
IP0179 # 07 Y:2023 | 07 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $378 | $3,830 | Not Implemented |
IP0179 # 01 Y:2023 | 01 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $471 | $0 | Not Implemented |
CC0020 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,402 | $3,033 | n/a |
CC0020 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $340 | $418 | n/a |
CC0020 # 10 Y:2023 | 10 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,194 | $0 | n/a |
CC0020 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,381 | $0 | n/a |
CC0020 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $17,389 | $200,000 | n/a |
CC0020 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $23,819 | $15,000 | n/a |
CC0020 # 11 Y:2023 | 11 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $4,104 | $6,050 | n/a |
CC0020 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,812 | $19,750 | n/a |
CC0020 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $905 | $1,622 | n/a |
CC0020 # 04 Y:2023 | 04 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $31,379 | $0 | n/a |
CC0020 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $54,767 | $200,000 | n/a |
CC0020 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $4,526 | $0 | n/a |
TT0302 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,184 | $15,000 | Not Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
TT0302 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,359 | $90,000 | Not Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
TT0302 # 08 Y:2023 | 08 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,956 | $965 | Not Implemented |
TT0302 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,990 | $20,000 | Not Implemented |