Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsNAICS | 3351 | Electric Lighting Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0749 # 04 Y:2015 | 04 | 2015 | OPTIMIZE PLANT POWER FACTOR | $10,366 | $25,300 | Not Implemented |
MA0749 # 12 Y:2015 | 12 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,079 | $100 | Implemented |
MA0749 # 11 Y:2015 | 11 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,227 | $1,013 | Not Implemented |
MA0749 # 10 Y:2015 | 10 | 2015 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,592 | $500 | Not Implemented |
MA0749 # 09 Y:2015 | 09 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,372 | $1,000 | Implemented |
MA0749 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,495 | $500 | Not Implemented |
MA0749 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,067 | $3,000 | Implemented |
MA0749 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,856 | $24,500 | Implemented |
MA0749 # 05 Y:2015 | 05 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,523 | $1,000 | Not Implemented |
MA0749 # 03 Y:2015 | 03 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,980 | $3,330 | Implemented |
MA0749 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $24,207 | $1,000 | Implemented |
MA0749 # 01 Y:2015 | 01 | 2015 | REDUCE VENTILATION AIR | $30,757 | $20,400 | Implemented |
CO0700 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,900 | $1,270 | Implemented |
CO0700 # 05 Y:2015 | 05 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $540 | $1,820 | Not Implemented |
CO0700 # 04 Y:2015 | 04 | 2015 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $4,840 | $15,500 | Not Implemented |
CO0700 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,950 | $82,280 | Not Implemented |
CO0700 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,710 | $0 | Not Implemented |