Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsNAICS | 3352 | Household Appliance Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1026 # 05 Y:2021 | 05 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $42,343 | $88,894 | Implemented |
UD1026 # 06 Y:2021 | 06 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $817 | $0 | Not Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
TT0233 # 05 Y:2020 | 05 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,206 | $22,392 | Not Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
TT0233 # 07 Y:2020 | 07 | 2020 | INSULATE BARE EQUIPMENT | $565 | $1,450 | Not Implemented |
WM0045 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,114 | $2,500 | Not Implemented |
WM0045 # 11 Y:2014 | 11 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,255 | $1,220 | Implemented |
WM0045 # 10 Y:2014 | 10 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $38 | $100 | Not Implemented |
WM0045 # 09 Y:2014 | 09 | 2014 | COVER OPEN TANKS | $51 | $0 | Implemented |
WM0045 # 08 Y:2014 | 08 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $313 | $630 | Not Implemented |
WM0045 # 07 Y:2014 | 07 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $478 | $280 | Implemented |
WM0045 # 06 Y:2014 | 06 | 2014 | IMPROVE SPACE COMFORT CONDITIONING | $4,160 | $350 | Not Implemented |
WM0045 # 05 Y:2014 | 05 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,440 | $940 | Not Implemented |
WM0045 # 04 Y:2014 | 04 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,111 | $2,030 | Not Implemented |
WM0045 # 03 Y:2014 | 03 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $2,701 | $0 | Implemented |
WM0045 # 01 Y:2014 | 01 | 2014 | RECYCLE WHITE WATER | $6,827 | $13,958 | Not Implemented |
NC0449 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,096 | $50,000 | Not Implemented |
NC0449 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,560 | Implemented |
NC0449 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,300 | $10,168 | Implemented |
NC0449 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,288 | $37,820 | Not Implemented |
NC0449 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,027 | $6,500 | Not Implemented |