Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
736
matching recommendationsNAICS | 3353 | Electrical Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0848 # 01 Y:2012 | 01 | 2012 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $550 | $1,000 | Not Implemented |
UD0848 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,519 | $5,000 | Implemented |
UD0848 # 03 Y:2012 | 03 | 2012 | MINIMIZE WATER USAGE | $1,496 | $1,000 | Not Implemented |
UD0848 # 04 Y:2012 | 04 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,458 | $0 | Not Implemented |
UD0848 # 05 Y:2012 | 05 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $239 | $0 | Not Implemented |
UD0848 # 06 Y:2012 | 06 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,962 | $1,000 | Not Implemented |
UD0848 # 07 Y:2012 | 07 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,543 | $0 | Implemented |
UD0848 # 08 Y:2012 | 08 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,209 | $1,000 | Not Implemented |
UD0848 # 09 Y:2012 | 09 | 2012 | REDUCE VENTILATION AIR | $882 | $300 | Implemented |
UD0848 # 10 Y:2012 | 10 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $834 | $600 | Not Implemented |
GT0887 # 01 Y:2011 | 01 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $44,987 | $50,000 | Not Implemented |
GT0887 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,870 | $41,828 | Not Implemented |
GT0887 # 03 Y:2011 | 03 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,160 | $5,000 | Not Implemented |
GT0887 # 04 Y:2011 | 04 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,327 | $0 | Not Implemented |
GT0887 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,716 | $2,500 | Implemented |
GT0887 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,230 | $0 | Not Implemented |
TT0072 # 01 Y:2011 | 01 | 2011 | USE OPTIMUM TEMPERATURE | $16,018 | $0 | Implemented |
CO0649 # 01 Y:2011 | 01 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $12,260 | $3,200 | Not Implemented |
CO0649 # 02 Y:2011 | 02 | 2011 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,530 | $20,000 | Not Implemented |
CO0649 # 03 Y:2011 | 03 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,610 | $480 | Not Implemented |
CO0649 # 04 Y:2011 | 04 | 2011 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $1,270 | $3,910 | Not Implemented |
CO0649 # 05 Y:2011 | 05 | 2011 | INSTALL SKYLIGHTS | $38,050 | $70,550 | Not Implemented |
CO0649 # 06 Y:2011 | 06 | 2011 | REDUCE VENTILATION AIR | $3,200 | $60 | Not Implemented |
CO0649 # 07 Y:2011 | 07 | 2011 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,770 | $60 | Not Implemented |
CO0649 # 08 Y:2011 | 08 | 2011 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,150 | $60 | Not Implemented |