IAC Assessment: BD0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2013
Principal Product Automobile Electronics
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $100,000,000-$500,000,000
# of Employees 296
Plant Area (Sq.Ft.) 164,450
Annual Production 21,404,700 Pieces
Production Hrs. Annual 7,072
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $402,069 6,832,000 kWh $0.06
Electricity Demand $145,320 13,840 kW-months/year $10.50
Electricity Fees $9,794 - $ -
Natural Gas $7,958 703 MMBtu $11.33
TOTAL ENERGY COSTS $572,886
RECOMMENDED SAVINGS* $63,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,412
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,364
Cost:
$30,195
$6,739 114,421 $2,601 248 - - $2,791 - $2,233 - $6,739
114,421
kWh
$2,601
248
kW-months/year
-
-
Tgal
$2,791
-
$
$2,233
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$12,995
Cost:
$1,140
$9,502 161,319 $3,493 333 - - - - - - $9,502
161,319
kWh
$3,493
333
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$11,571
Cost:
$15,000
$8,888 150,893 $2,683 256 - - - - - - $8,888
150,893
kWh
$2,683
256
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,147
Cost:
$1,500
$3,184 54,060 $963 92 - - - - - - $3,184
54,060
kWh
$963
92
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,067
Cost:
$1,425
$3,061 51,978 $3,006 286 - - - - - - $3,061
51,978
kWh
$3,006
286
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$5,564
Cost:
$40
- - $5,564 530 - - - - - - -
-
kWh
$5,564
530
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,968
Cost:
$1,500
$1,480 25,126 $488 43 - - - - - - $1,480
25,126
kWh
$488
43
kW-months/year
-
-
Tgal
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,219
Cost:
$2,000
$448 7,606 $771 74 - - - - - - $448
7,606
kWh
$771
74
kW-months/year
-
-
Tgal
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$759
Cost:
$700
$392 6,658 $96 9 - - $115 - $156 - $392
6,658
kWh
$96
9
kW-months/year
-
-
Tgal
$115
-
$
$156
-
$
10: 3.4151 MINIMIZE WATER USAGE Savings:
$4,683
Cost:
$4,200
- - - - $4,683 373,464 - - - - -
-
kWh
-
-
kW-months/year
$4,683
373,464
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$63,337
Cost:
$57,700
$33,694 572,061 $19,665 1,869 $4,683 373,464 $2,906 - $2,389 - $33,694
572,061
kWh
$19,665
1,869
kW-months/year
$4,683
373,464
Tgal
$2,906
-
$
$2,389
-
$
TOTAL IMPLEMENTED Savings:
$39,412
Cost:
$53,020
$20,560 349,076 $8,874 841 $4,683 373,464 $2,906 - $2,389 - $20,560
349,076
kWh
$8,874
841
kW-months/year
$4,683
373,464
Tgal
$2,906
-
$
$2,389
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost