Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,089
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2505 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,475 | $1,500 | n/a |
UC2505 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,106 | $495,624 | n/a |
UC2505 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $39,288 | $50,000 | n/a |
UC2505 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,529 | $63,000 | n/a |
UC2505 # 08 Y:2024 | 08 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,963 | $0 | n/a |
UC2505 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,294 | $852 | n/a |
UC2505 # 03 Y:2024 | 03 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,253 | $2,096 | n/a |
UC2505 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,138 | $1,140 | n/a |
UC2505 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,438 | $75 | n/a |
TT0328 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $92,553 | $200,000 | n/a |
TT0328 # 05 Y:2025 | 05 | 2025 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,760 | $41,250 | n/a |
TT0328 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,990 | n/a |
TT0328 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,908 | $60,000 | n/a |
TT0328 # 11 Y:2025 | 11 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,157 | $299 | n/a |
TT0328 # 01 Y:2025 | 01 | 2025 | REDUCE OR ELIMINATE WASTE | $296,352 | $1,200,000 | n/a |
TT0328 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $81,754 | $144,000 | n/a |
TT0328 # 02 Y:2025 | 02 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $184,128 | $600,000 | n/a |
TT0328 # 13 Y:2025 | 13 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $306 | $50 | n/a |
TT0328 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,275 | $56,250 | n/a |
TT0328 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,721 | $631,361 | n/a |
TT0328 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $50 | n/a |
TT0328 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,237 | $50 | n/a |
IP0206 # 06 Y:2024 | 06 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,970 | $4,748 | n/a |
IP0206 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,184 | $17,042 | n/a |
IP0206 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,530 | $714 | n/a |