Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0331 # 08 Y:2022 | 08 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $110,196 | $55,220 | Not Implemented |
MZ0331 # 07 Y:2022 | 07 | 2022 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $76,144 | $423,000 | Not Implemented |
MZ0331 # 06 Y:2022 | 06 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,613 | $98,280 | Implemented |
MZ0331 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $402,938 | $1,820,000 | Not Implemented |
MZ0331 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,985 | $29,286 | Implemented |
MZ0331 # 03 Y:2022 | 03 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $91,773 | $9,040 | Implemented |
MZ0331 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,037 | $46,350 | Implemented |
MZ0331 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,162 | $25,757 | Implemented |
MZ0252 # 05 Y:2018 | 05 | 2018 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $65,281 | $50,000 | Implemented |
MZ0252 # 02 Y:2018 | 02 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,478 | $32,500 | Implemented |
MZ0252 # 01 Y:2018 | 01 | 2018 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,011 | $540 | Implemented |
MZ0252 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $516 | $50 | Implemented |
MZ0252 # 04 Y:2018 | 04 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,159 | $0 | Implemented |
MZ0252 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $656 | $4,200 | Not Implemented |
MZ0237 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $36,123 | $11,000 | Implemented |
MZ0237 # 08 Y:2017 | 08 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,338 | $0 | Implemented |
MZ0237 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $0 | Implemented |
MZ0237 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,362 | $25,000 | Implemented |
MZ0237 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $599 | $50 | Implemented |
MZ0237 # 03 Y:2017 | 03 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,548 | $0 | Not Implemented |
MZ0237 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $262 | $800 | Not Implemented |
MZ0237 # 01 Y:2017 | 01 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,793 | $0 | Implemented |
MZ0203 # 04 Y:2016 | 04 | 2016 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,109 | $37,500 | Not Implemented |
MZ0203 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,707 | $11,425 | Implemented |
MZ0203 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,747 | $680 | Implemented |