Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 3359 | Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0398 # 08 Y:2021 | 08 | 2021 | USE PHOTOCELL CONTROLS | $1,120 | $4,014 | Not Implemented |
MI0398 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,694 | $1,650 | Not Implemented |
MI0398 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,526 | $2,020 | Not Implemented |
MI0398 # 03 Y:2021 | 03 | 2021 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,084 | $100 | Not Implemented |
MI0398 # 05 Y:2021 | 05 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $5,350 | $849 | Not Implemented |
MI0398 # 06 Y:2021 | 06 | 2021 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $5,300 | $9,444 | Not Implemented |
MI0398 # 04 Y:2021 | 04 | 2021 | PAY UTILITY BILLS ON TIME | $11,152 | $0 | Not Implemented |
MI0398 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,388 | $4,059 | Not Implemented |
TT0261 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $49,358 | $3,200 | Implemented |
TT0261 # 08 Y:2021 | 08 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,221 | $9,600 | Not Implemented |
TT0261 # 07 Y:2021 | 07 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,374 | $0 | Implemented |
TT0261 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,718 | $15,000 | Not Implemented |
TT0261 # 05 Y:2021 | 05 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,133 | $3,000 | Not Implemented |
TT0261 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $26,082 | $700 | Implemented |
TT0261 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $30,912 | $38,200 | Not Implemented |
TT0261 # 09 Y:2021 | 09 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $703 | $850 | Not Implemented |
TT0261 # 01 Y:2021 | 01 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $188,912 | $733,702 | Implemented |
SU0508 # 06 Y:2021 | 06 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,878 | $15,784 | Not Implemented |
SU0508 # 05 Y:2021 | 05 | 2021 | ELIMINATE/REDUCE AN OPERATION | $4,431 | $5,566 | Not Implemented |
SU0508 # 04 Y:2021 | 04 | 2021 | INSTALL / REPAIR INSULATION ON STEAM LINES | $202 | $107 | Not Implemented |
SU0508 # 03 Y:2021 | 03 | 2021 | REDUCE VENTILATION AIR | $2,405 | $499 | Not Implemented |
SU0508 # 02 Y:2021 | 02 | 2021 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $775 | $81 | Not Implemented |
SU0508 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33 | $0 | Not Implemented |
SU0508 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $3,900 | $5,861 | Not Implemented |
SU0508 # 10 Y:2021 | 10 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $158 | $393 | Not Implemented |