Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
252
matching recommendationsNAICS | 33591 | Battery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0476 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,955 | $1,607 | Not Implemented |
SU0476 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $803 | $433 | Implemented |
SU0476 # 03 Y:2019 | 03 | 2019 | REDUCE VENTILATION AIR | $3,103 | $894 | Not Implemented |
SU0476 # 02 Y:2019 | 02 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,702 | $131 | Implemented |
SU0476 # 01 Y:2019 | 01 | 2019 | DISCONNECT BALLASTS | $216 | $0 | Implemented |
GT0916 # 01 Y:2018 | 01 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,228 | $263 | Implemented |
GT0916 # 02 Y:2018 | 02 | 2018 | AIR CONDITION ONLY SPACE NECESSARY | $5,518 | $200 | Not Implemented |
GT0916 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM TEMPERATURE | $29,211 | $1,600 | Not Implemented |
GT0916 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,820 | $207,295 | Not Implemented |
GT0916 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,406 | $38,834 | Implemented |
GT0916 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,215 | $10,400 | Implemented |
GT0916 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $12,211 | $1,242 | Not Implemented |
GT0916 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $41,023 | $3,991 | Not Implemented |
GT0916 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $55,747 | $3,800 | Implemented |
OR0687 # 05 Y:2017 | 05 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $6,460 | $16,124 | Not Implemented |
OR0687 # 04 Y:2017 | 04 | 2017 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $3,195 | $5,650 | Not Implemented |
OR0687 # 03 Y:2017 | 03 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $205,629 | $340,000 | Not Implemented |
OR0687 # 02 Y:2017 | 02 | 2017 | USE PHOTOCELL CONTROLS | $2,967 | $2,000 | Not Implemented |
OR0687 # 01 Y:2017 | 01 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,090 | $600 | Not Implemented |
MZ0237 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $599 | $50 | Implemented |
MZ0237 # 01 Y:2017 | 01 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,793 | $0 | Implemented |
MZ0237 # 07 Y:2017 | 07 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $69 | $0 | Implemented |
MZ0237 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,362 | $25,000 | Implemented |
MZ0237 # 03 Y:2017 | 03 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,548 | $0 | Not Implemented |
MZ0237 # 08 Y:2017 | 08 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,338 | $0 | Implemented |