Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
301
matching recommendationsNAICS | 33593 | Wiring Device Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0483 # 03 Y:2019 | 03 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,352 | $12,000 | Not Implemented |
LE0483 # 04 Y:2019 | 04 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,605 | $12,900 | Not Implemented |
LE0483 # 05 Y:2019 | 05 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,574 | $20,000 | Implemented |
MI0357 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $558 | $1,773 | Not Implemented |
MI0357 # 08 Y:2019 | 08 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $996 | $2,040 | Implemented |
MI0357 # 07 Y:2019 | 07 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,267 | $1,195 | Implemented |
MI0357 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,575 | $160 | Implemented |
MI0357 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $3,870 | $8,000 | Implemented |
MI0357 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,177 | $2,193 | Not Implemented |
MI0357 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,689 | $1,980 | Implemented |
MI0357 # 02 Y:2019 | 02 | 2019 | USE SOLAR HEAT TO HEAT WATER | $11,005 | $67,338 | Not Implemented |
MI0357 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $18,306 | $3,600 | Implemented |
TT0224 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,374 | $16,645 | Implemented |
TT0224 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,405 | $3,200 | Implemented |
TT0224 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM THICKNESS INSULATION | $45,228 | $60,000 | Not Implemented |
TT0224 # 01 Y:2019 | 01 | 2019 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $119,892 | $51,560 | Implemented |
TT0224 # 05 Y:2019 | 05 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $14,353 | $500 | Implemented |
TT0224 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,767 | $1,910 | Not Implemented |
TT0224 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $7,188 | $600 | Not Implemented |
TT0224 # 08 Y:2019 | 08 | 2019 | USE OPTIMUM THICKNESS INSULATION | $3,722 | $10,752 | Implemented |
TT0224 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,042 | $640 | Not Implemented |
TT0224 # 10 Y:2019 | 10 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $40 | Not Implemented |
SU0474 # 01 Y:2019 | 01 | 2019 | DISCONNECT BALLASTS | $1,094 | $3,500 | Implemented |
SU0474 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $8,523 | $18,735 | Implemented |
SU0474 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $357 | $650 | Implemented |