IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
Reset
NAICS 33593 Wiring Device Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0483 # 03 Y:2019 03 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,352 $12,000 Not Implemented
LE0483 # 04 Y:2019 04 2019 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,605 $12,900 Not Implemented
LE0483 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,574 $20,000 Implemented
MI0357 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $558 $1,773 Not Implemented
MI0357 # 08 Y:2019 08 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $996 $2,040 Implemented
MI0357 # 07 Y:2019 07 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,267 $1,195 Implemented
MI0357 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,575 $160 Implemented
MI0357 # 05 Y:2019 05 2019 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,870 $8,000 Implemented
MI0357 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,177 $2,193 Not Implemented
MI0357 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,689 $1,980 Implemented
MI0357 # 02 Y:2019 02 2019 USE SOLAR HEAT TO HEAT WATER $11,005 $67,338 Not Implemented
MI0357 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $18,306 $3,600 Implemented
TT0224 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $16,645 Implemented
TT0224 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,405 $3,200 Implemented
TT0224 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $45,228 $60,000 Not Implemented
TT0224 # 01 Y:2019 01 2019 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $119,892 $51,560 Implemented
TT0224 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $14,353 $500 Implemented
TT0224 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,767 $1,910 Not Implemented
TT0224 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $7,188 $600 Not Implemented
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $640 Not Implemented
TT0224 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $40 Not Implemented
SU0474 # 01 Y:2019 01 2019 DISCONNECT BALLASTS $1,094 $3,500 Implemented
SU0474 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $8,523 $18,735 Implemented
SU0474 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $357 $650 Implemented