Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
346
matching recommendationsNAICS | 33599 | All Other Electrical Equipment and Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2505 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $39,288 | $50,000 | n/a |
UC2505 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,438 | $75 | n/a |
UC2505 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,475 | $1,500 | n/a |
UC2505 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,294 | $852 | n/a |
UC2505 # 06 Y:2024 | 06 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,529 | $63,000 | n/a |
UC2505 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,106 | $495,624 | n/a |
UC2505 # 03 Y:2024 | 03 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $4,253 | $2,096 | n/a |
UC2505 # 08 Y:2024 | 08 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,963 | $0 | n/a |
UC2505 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,138 | $1,140 | n/a |
TT0328 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $81,754 | $144,000 | n/a |
TT0328 # 01 Y:2025 | 01 | 2025 | REDUCE OR ELIMINATE WASTE | $296,352 | $1,200,000 | n/a |
TT0328 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,275 | $56,250 | n/a |
TT0328 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $41,721 | $631,361 | n/a |
TT0328 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,292 | $50 | n/a |
TT0328 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,908 | $60,000 | n/a |
TT0328 # 13 Y:2025 | 13 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $306 | $50 | n/a |
TT0328 # 05 Y:2025 | 05 | 2025 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $52,760 | $41,250 | n/a |
TT0328 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,117 | $1,990 | n/a |
TT0328 # 11 Y:2025 | 11 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,157 | $299 | n/a |
TT0328 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $92,553 | $200,000 | n/a |
TT0328 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,237 | $50 | n/a |
TT0328 # 02 Y:2025 | 02 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $184,128 | $600,000 | n/a |
LE0564 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,320 | $61,333 | Not Implemented |
LE0564 # 10 Y:2024 | 10 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $697 | $3,400 | Not Implemented |
LE0564 # 03 Y:2024 | 03 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $5,156 | $200 | Implemented |