IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 33599 All Other Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0252 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,478 $32,500 Implemented
MZ0252 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $656 $4,200 Not Implemented
MZ0252 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,159 $0 Implemented
MZ0252 # 05 Y:2018 05 2018 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $65,281 $50,000 Implemented
MZ0252 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $516 $50 Implemented
MZ0252 # 01 Y:2018 01 2018 INSTALL SPECTRAL REFLECTORS / DELAMP $4,011 $540 Implemented
MZ0166 # 09 Y:2015 09 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,328 $5,600 Implemented
MZ0166 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $0 Implemented
MZ0166 # 07 Y:2015 07 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,419 $5,868 Implemented
MZ0166 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,376 $0 Not Implemented
MZ0166 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,014 $1,160 Implemented
MZ0166 # 04 Y:2015 04 2015 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $617 $100 Implemented
MZ0166 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $675 $900 Implemented
MZ0166 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $119 $180 Implemented
MZ0166 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $6,500 Implemented
MZ0091 # 06 Y:2012 06 2012 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $24,311 $9,516 Implemented
MZ0091 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,133 $0 Implemented
MZ0091 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,504 $0 Implemented
MZ0091 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,809 $27,800 Implemented
MZ0091 # 02 Y:2012 02 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,699 $0 Implemented
MZ0091 # 01 Y:2012 01 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $190,000 $5,000 Implemented