IAC logo
IAC Assessment: MZ0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MZ0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri-Columbia
Assessment Year 2012
Principal Product electrical heaters
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales <$500,000
# of Employees 4
Plant Area (Sq.Ft.) 400,000
Annual Production 1 Units
Production Hrs. Annual 4,368
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $354,959 3,770,053 kWh $0.09
TOTAL ENERGY COSTS $354,959
RECOMMENDED SAVINGS* $269,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $269,456
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Primary Raw Material Electricity Usage Electricity Fees Primary Raw Material
$ kWh $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$190,000
Cost:
$5,000
- - - - $190,000 - -
-
kWh
-
-
$
$190,000
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,699
Cost:
-
- - $18,699 - - - -
-
kWh
$18,699
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$30,809
Cost:
$27,800
$30,809 327,755 - - - - $30,809
327,755
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,504
Cost:
-
$2,504 26,636 - - - - $2,504
26,636
kWh
-
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,133
Cost:
-
$3,133 33,328 - - - - $3,133
33,328
kWh
-
-
$
-
-
$
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$24,311
Cost:
$9,516
$(-889) (-9,453) $25,200 - - - $(-889)
(-9,453)
kWh
$25,200
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$269,456
Cost:
$42,316
$35,557 378,266 $43,899 - $190,000 - $35,557
378,266
kWh
$43,899
-
$
$190,000
-
$
TOTAL IMPLEMENTED Savings:
$269,456
Cost:
$42,316
$35,557 378,266 $43,899 - $190,000 - $35,557
378,266
kWh
$43,899
-
$
$190,000
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Primary Raw Material Electricity Usage Electricity Fees Primary Raw Material