IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
Reset
NAICS 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0209 # 13 Y:2022 13 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $658 $10,000 Not Implemented
MI0398 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,388 $4,059 Not Implemented
MI0398 # 06 Y:2021 06 2021 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $5,300 $9,444 Not Implemented
MI0398 # 05 Y:2021 05 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,350 $849 Not Implemented
MI0398 # 04 Y:2021 04 2021 PAY UTILITY BILLS ON TIME $11,152 $0 Not Implemented
MI0398 # 03 Y:2021 03 2021 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,084 $100 Not Implemented
MI0398 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,526 $2,020 Not Implemented
MI0398 # 08 Y:2021 08 2021 USE PHOTOCELL CONTROLS $1,120 $4,014 Not Implemented
MI0398 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,694 $1,650 Not Implemented
SF0527 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,577 $0 Implemented
SF0527 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $545 $70 Implemented
SF0527 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,584 $27,496 Implemented
SF0527 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $76,906 $341,292 Not Implemented
NL0003 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,412 $15,000 Not Implemented
NL0003 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $250 Not Implemented
NL0003 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $348 $1,250 Not Implemented
NL0003 # 03 Y:2017 03 2017 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $1,586 $4,300 Not Implemented
NL0003 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $1,797 $14,000 Implemented
MZ0166 # 09 Y:2015 09 2015 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $3,328 $5,600 Implemented
MZ0166 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $6,500 Implemented
MZ0166 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $119 $180 Implemented
MZ0166 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $675 $900 Implemented
MZ0166 # 04 Y:2015 04 2015 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $617 $100 Implemented
MZ0166 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,376 $0 Not Implemented
MZ0166 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,014 $1,160 Implemented