Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0240 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $49,476 | $225,000 | Implemented |
DL0240 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,202 | $14,500 | Implemented |
DL0240 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,194 | $3,716 | Implemented |
DL0240 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $40,323 | $0 | Implemented |
DL0240 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,910 | $0 | Implemented |
DL0240 # 01 Y:2024 | 01 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $12,775 | $0 | Implemented |
DL0135 # 07 Y:2014 | 07 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,400 | $0 | Implemented |
DL0135 # 05 Y:2014 | 05 | 2014 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,000 | $0 | Implemented |
DL0135 # 02 Y:2014 | 02 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,800 | $1,450 | Implemented |
DL0135 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $27,900 | $0 | Implemented |
DL0079 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,364 | $1,015 | Implemented |
DL0079 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $464 | $105 | Implemented |
DL0079 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,317 | $350 | Implemented |
DL0079 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,737 | $100 | Implemented |
DL0079 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,495 | $36,850 | Implemented |
DL0068 # 09 Y:2011 | 09 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $32,300 | $200 | Implemented |
DL0068 # 06 Y:2011 | 06 | 2011 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $51,400 | $10,000 | Implemented |
DL0068 # 05 Y:2011 | 05 | 2011 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $21,659 | $4,300 | Implemented |
DL0068 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $51,300 | $12,000 | Implemented |
DL0068 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,200 | $3,200 | Implemented |
DL0068 # 01 Y:2011 | 01 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,500 | $200 | Implemented |
DL0026 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,377 | $45,000 | Implemented |
DL0026 # 07 Y:2008 | 07 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,000 | $40,000 | Implemented |
DL0026 # 02 Y:2008 | 02 | 2008 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $15,500 | $0 | Implemented |
DL0026 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $38,000 | $0 | Implemented |