IAC logo
IAC Assessment: DL0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2011
Principal Product Motor Vehicles
NAICS 336111 - Automobile Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales >$500,000,000
# of Employees 30
Plant Area (Sq.Ft.) 1,800,000
Annual Production 999,999,999 Units
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $960,000 12,000,000 kWh $0.08
Natural Gas $226,270 18,700 MMBtu $12.10
TOTAL ENERGY COSTS $1,186,270
RECOMMENDED SAVINGS* $554,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $186,359
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,500
Cost:
$200
$14,500 181,000 - - $14,500
181,000
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,200
Cost:
$3,200
$15,200 190,800 - - $15,200
190,800
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$51,300
Cost:
$12,000
$51,300 641,700 - - $51,300
641,700
kWh
-
-
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$182,000
Cost:
$17,000
$182,000 2,280,000 - - $182,000
2,280,000
kWh
-
-
MMBtu
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$21,659
Cost:
$4,300
- - $21,659 1,790 -
-
kWh
$21,659
1,790
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$51,400
Cost:
$10,000
- - $51,400 4,250 -
-
kWh
$51,400
4,250
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,315
Cost:
$15,000
- - $3,315 274 -
-
kWh
$3,315
274
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183,000
Cost:
$600,000
$183,000 2,290,000 - - $183,000
2,290,000
kWh
-
-
MMBtu
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$32,300
Cost:
$200
$32,300 404,100 - - $32,300
404,100
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$554,674
Cost:
$661,900
$478,300 5,987,600 $76,374 6,314 $478,300
5,987,600
kWh
$76,374
6,314
MMBtu
TOTAL IMPLEMENTED Savings:
$186,359
Cost:
$29,900
$113,300 1,417,600 $73,059 6,040 $113,300
1,417,600
kWh
$73,059
6,040
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas