Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,942
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0458 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,021 | $0 | n/a |
MI0458 # 05 Y:2025 | 05 | 2025 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $187 | $492 | n/a |
MI0458 # 06 Y:2025 | 06 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,821 | $10,749 | n/a |
MI0458 # 02 Y:2025 | 02 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,107 | $532 | n/a |
MI0458 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,923 | $7,236 | n/a |
MI0458 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $636 | $160 | n/a |
UU0271 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $771 | $5,877 | n/a |
UU0271 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $133 | $1,175 | n/a |
UU0271 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,296 | $11,327 | n/a |
UU0271 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,046 | $20,000 | n/a |
UU0271 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $335 | $648 | n/a |
UU0271 # 01 Y:2025 | 01 | 2025 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,038 | $1,248 | n/a |
UU0271 # 04 Y:2025 | 04 | 2025 | MINIMIZE WATER USAGE | $3,231 | $23,282 | n/a |
MS0446 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,927 | $24,500 | n/a |
MS0446 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,744 | $100,000 | n/a |
MS0446 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,685 | $716,889 | n/a |
MS0446 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,646 | $4,652 | n/a |
UW2503 # 02 Y:2025 | 02 | 2025 | INSULATE FEEDWATER TANK | $1,063 | $489 | n/a |
UW2503 # 01 Y:2025 | 01 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $22,742 | $12,849 | n/a |
UW2503 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,848 | $210,600 | n/a |
UW2503 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,132 | $25,000 | n/a |
UW2503 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $52,839 | $2,112 | n/a |
SU0571 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,560 | $1,856,682 | n/a |
SU0571 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,170 | $0 | n/a |
SU0571 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,489 | $632 | n/a |