IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1043 # 05 Y:2021 05 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $2,008 $952 Not Implemented
OK1043 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,397 $2,946 Implemented
OK1043 # 03 Y:2021 03 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,309 $35,400 Implemented
OK1043 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $331 $1,650 Implemented
OK1043 # 01 Y:2021 01 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,091 $8,000 Implemented
TT0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,248 $3,360 Implemented
TT0237 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,481 $13,500 Not Implemented
TT0237 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $760 Implemented
TT0237 # 06 Y:2020 06 2020 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $6,985 $480 Not Implemented
TT0237 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $11,220 $20 Implemented
TT0237 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,896 $10 Implemented
TT0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,403 $33,173 Implemented
TT0237 # 07 Y:2020 07 2020 METER WASTE WATER $6,876 $2,000 Implemented
TT0237 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,785 $4,720 Not Implemented
TT0237 # 11 Y:2020 11 2020 DEVELOP A REPAIR/REPLACE POLICY $339 $653 Not Implemented
TT0237 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,445 $0 Implemented
TT0192 # 10 Y:2017 10 2017 DEVELOP A REPAIR/REPLACE POLICY $796 $1,453 Not Implemented
TT0192 # 09 Y:2017 09 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,309 $10,000 Not Implemented
TT0192 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175,487 $344,898 Implemented
TT0192 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,730 $18,400 Implemented
TT0192 # 03 Y:2017 03 2017 INSTALL TIMERS AND/OR THERMOSTATS $7,986 $5,250 Not Implemented
TT0192 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,492 $11,000 Not Implemented
TT0192 # 05 Y:2017 05 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,432 $9,000 Not Implemented
TT0192 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $20,000 Not Implemented
TT0192 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,001 $3,000 Not Implemented