IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0673 # 10 Y:2024 10 2024 UPGRADE CONTROLS ON COMPRESSORS $613 $3,000 n/a
WV0673 # 01 Y:2024 01 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $55,596 $232,663 n/a
WV0673 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $20,643 $75,157 n/a
WV0673 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $6,139 $11,569 n/a
WV0673 # 08 Y:2024 08 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,740 $1,420 n/a
WV0673 # 07 Y:2024 07 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,917 $5,832 n/a
WV0673 # 13 Y:2024 13 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $177 $688 n/a
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 n/a
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 n/a
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 n/a
WV0673 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $179 $80 n/a
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 n/a
WV0673 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,359 $6,620 n/a
DL0242 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,043 $0 n/a
DL0242 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,049 $191 n/a
DL0242 # 04 Y:2024 04 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,290 $11,200 n/a
DL0242 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,703 $0 n/a
DL0242 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,258 $0 n/a
WV0654 # 11 Y:2023 11 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $612 $1,300 Not Implemented
WV0654 # 09 Y:2023 09 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $951 $330 Not Implemented
WV0654 # 07 Y:2023 07 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,242 $6,000 Implemented
WV0654 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,093 $1,113 Implemented
WV0654 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $3,551 $9,700 Implemented
WV0654 # 04 Y:2023 04 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,126 $9,645 Implemented
WV0654 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $648 $3,230 Implemented