IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0421 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $5,635 $651 Not Implemented
IA0421 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $950 $2,575 Implemented
IA0421 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $4,080 Implemented
IA0421 # 05 Y:2007 05 2007 MODIFY STARTUP/SHUTDOWN TIMES $2,951 $500 Implemented
IA0421 # 06 Y:2007 06 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,749 $60 Implemented
IA0421 # 07 Y:2007 07 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $1,093 $1,800 Implemented
IA0421 # 08 Y:2007 08 2007 MINIMIZE WATER USAGE $10,056 $400 Implemented
UM0335 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $89,698 $182,750 Not Implemented
UM0335 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $74,186 $72,325 Not Implemented
UM0335 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $36,521 $12,950 Not Implemented
UM0335 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $31,917 $18,591 Not Implemented
UM0335 # 05 Y:2008 05 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,221 $500 Implemented
UM0335 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,331 $15,000 Implemented
UM0335 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,972 $50 Implemented
UM0335 # 08 Y:2008 08 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,901 $1,621 Not Implemented
WV0372 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,998 $34,945 Not Implemented
WV0372 # 02 Y:2008 02 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,813 $2,000 Implemented
WV0372 # 03 Y:2008 03 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,188 $511 Implemented
WV0372 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $7,107 $540 Not Implemented
WV0372 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,593 $8,011 Implemented
WV0372 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,074 $4,500 Implemented
WV0372 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $3,550 $890 Implemented
WV0372 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,560 $2,750 Not Implemented
WV0372 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,523 $0 Implemented
WV0372 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $460 Not Implemented