IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,971

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0560 # 04 Y:2024 04 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,378 $2,500 Implemented
LE0560 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,740 $51,000 Not Implemented
LE0560 # 06 Y:2024 06 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,350 $11,000 Implemented
LE0560 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,755 $45,000 Not Implemented
OK1107 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,461 $20,075 Not Implemented
OK1107 # 02 Y:2024 02 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $99,540 $804,825 Not Implemented
OK1107 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $33,098 $353,808 Not Implemented
OK1107 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,761 $0 Not Implemented
OK1107 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $3,416 Not Implemented
OK1107 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,278 $792 Not Implemented
OK1107 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $461 $354 Not Implemented
OK1107 # 08 Y:2024 08 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,517 $1,048 Not Implemented
SJ0015 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $179,675 $962,431 Implemented
SJ0015 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,301 $7,684 Implemented
SJ0015 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $676 $680 Implemented
SJ0015 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $3,809 $766 Implemented
SJ0015 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,211 $98 Implemented
SJ0015 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,763 $0 Implemented
SJ0015 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,620 $1,986 Not Implemented
SJ0015 # 08 Y:2024 08 2024 COMBINE UTILITY METERS $1,748 $0 Not Implemented
SJ0015 # 09 Y:2024 09 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $146,431 $0 Implemented
DL0237 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,341 $0 Implemented
DL0237 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,667 $0 Implemented
DL0237 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,998 $0 Implemented
DL0237 # 04 Y:2024 04 2024 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,180 $64 Implemented