Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,754
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0392 # 05 Y:2006 | 05 | 2006 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,308 | $735 | Implemented |
IA0392 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,268 | $2,268 | Implemented |
IA0392 # 07 Y:2006 | 07 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,514 | $1,650 | Implemented |
IA0392 # 08 Y:2006 | 08 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $657 | $1,300 | Not Implemented |
OK0734 # 01 Y:2006 | 01 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $25,049 | $15,000 | Not Implemented |
OK0734 # 02 Y:2006 | 02 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $33,532 | $47,764 | Implemented |
OK0734 # 03 Y:2006 | 03 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,323 | $5,175 | Implemented |
OK0734 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $219 | $1,290 | Not Implemented |
OK0734 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,594 | $1,150 | Not Implemented |
OK0734 # 06 Y:2006 | 06 | 2006 | INSTALL OCCUPANCY SENSORS | $237 | $1,013 | Not Implemented |
OK0734 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $3,000 | $500 | Implemented |
UM0302 # 01 Y:2006 | 01 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $41,312 | $7,600 | Not Implemented |
UM0302 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,991 | $1,000 | Implemented |
UM0302 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,381 | $1,500 | Implemented |
UM0302 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,195 | $7,724 | Not Implemented |
UM0302 # 05 Y:2006 | 05 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,420 | $1,500 | Not Implemented |
UM0302 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,331 | $2,000 | Not Implemented |
UM0302 # 07 Y:2006 | 07 | 2006 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,184 | $845 | Implemented |
UM0302 # 08 Y:2006 | 08 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $387 | $25 | Implemented |
OK0731 # 01 Y:2006 | 01 | 2006 | USE SOLAR HEAT FOR HEAT | $97,944 | $80,060 | Not Implemented |
OK0731 # 02 Y:2006 | 02 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,213 | $0 | Implemented |
OK0731 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,514 | $3,851 | Not Implemented |
OK0731 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,650 | $9,975 | Not Implemented |
OK0731 # 05 Y:2006 | 05 | 2006 | INSTALL OCCUPANCY SENSORS | $1,071 | $3,949 | Implemented |
OK0731 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $732 | $727 | Implemented |