IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

401

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0248 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $100 Not Implemented
UA0248 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $274 Implemented
UA0243 # 01 Y:2021 01 2021 INSTALL OCCUPANCY SENSORS $6,816 $22,649 Not Implemented
UA0243 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $8,709 $24,348 Not Implemented
UA0243 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $45,219 $10,941 Implemented
UA0243 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,058 $9,682 Implemented
UA0243 # 05 Y:2021 05 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,529 $100 Not Implemented
UA0243 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,133 $4,930 Not Implemented
UA0240 # 01 Y:2021 01 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,059 $800 Implemented
UA0240 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $8,528 $60,000 Implemented
UA0240 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,894 $9,682 Implemented
UA0239 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,348 $23,987 Implemented
UA0239 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $364 $51 Implemented
UA0239 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,641 $9,144 Not Implemented
UA0239 # 07 Y:2021 07 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $18,822 $2,500 Not Implemented
UA0239 # 08 Y:2021 08 2021 USE RADIANT HEATER FOR SPOT HEATING $794 $709 Not Implemented
UA0239 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $12,847 $4,947 Not Implemented
UA0239 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,993 $2,238 Implemented
UA0239 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,194 $50 Implemented
UA0236 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,400 $808 Not Implemented
UA0236 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,959 $800 Not Implemented
UA0236 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,957 $4,200 Implemented
UA0236 # 02 Y:2021 02 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,582 $846 Implemented
UA0236 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,459 $3,873 Implemented
UA0235 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,137 $81 Implemented