IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

520

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0041 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,396 $6,403 Implemented
MU0041 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $673 $240 Implemented
MU0041 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,235 $100,548 Implemented
MU0041 # 07 Y:2023 07 2023 INSTALL SET-BACK TIMERS $86,283 $371,500 Implemented
MU0041 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $270 $189 Not Implemented
MU0041 # 10 Y:2023 10 2023 USE RADIANT HEATER FOR SPOT HEATING $4,201 $33,470 Not Implemented
MU0041 # 11 Y:2023 11 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,870 $5,510 Not Implemented
MU0041 # 12 Y:2023 12 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $4,105 $5,076 Implemented
MU0041 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,605 $0 Implemented
MUCM17 # 02 Y:2023 02 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,295 $791 Not Implemented
MUCM17 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,804 $2,090 Not Implemented
MUCM17 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $170 Implemented
MUCM17 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $26,757 Implemented
MUCM17 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $117 $299 Not Implemented
MUCM17 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5 $16 Not Implemented
MU0027 # 07 Y:2023 07 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,660 $0 Implemented
MU0027 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,992 $0 Implemented
MU0027 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23 $24 Implemented
MU0027 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $42 $0 Implemented
MU0027 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,030 $0 Implemented
MU0027 # 01 Y:2023 01 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,446 $0 Implemented
MU0027 # 09 Y:2023 09 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,480 $6,400 Not Implemented
MU0027 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,266 $9,146 Implemented
MU0027 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $627 $792 Implemented
MU0020 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,404 $5,949 Implemented