IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,754

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0150 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $654 $1,559 Implemented
MI0394 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $24,463 $480 Implemented
MI0394 # 02 Y:2021 02 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,537 $1,380 Not Implemented
MI0394 # 03 Y:2021 03 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,170 $2,549 Not Implemented
MI0394 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,060 $14,609 Not Implemented
MI0394 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,836 $2,100 Not Implemented
MI0394 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,427 $1,980 Implemented
MI0394 # 07 Y:2021 07 2021 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,040 $616 Not Implemented
MI0394 # 08 Y:2021 08 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,367 $2,549 Implemented
UU0192 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,219 $52,219 Implemented
UU0192 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,872 $40,613 Implemented
UU0192 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,994 $15,475 Implemented
UU0192 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $3,945 $5,606 Implemented
UU0192 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $2,978 $3,520 Implemented
UU0192 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,269 $1,000 Not Implemented
UU0192 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,064 $4,892 Implemented
UU0192 # 08 Y:2022 08 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $464 $100 Not Implemented
UD1031 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,133 $5,000 Not Implemented
UD1031 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,382 $0 Implemented
UD1031 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,188 $676 Implemented
UD1031 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,863 $10,000 Not Implemented
UD1031 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Implemented
UD1031 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $31,642 $15,000 Not Implemented
UD1031 # 07 Y:2022 07 2022 COVER OPEN TANKS $7,338 $15,000 Not Implemented
UD1031 # 08 Y:2022 08 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $30,918 $30,918 Not Implemented