Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,085
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2505 # 02 Y:2025 | 02 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $30,117 | $4,550 | n/a |
UW2505 # 03 Y:2025 | 03 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,963 | $191,676 | n/a |
UW2505 # 04 Y:2025 | 04 | 2025 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $55,282 | $123,500 | n/a |
UW2505 # 05 Y:2025 | 05 | 2025 | INSULATE FEEDWATER TANK | $815 | $443 | n/a |
UW2505 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM THICKNESS INSULATION | $950 | $3,710 | n/a |
MS0446 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,685 | $716,889 | n/a |
MS0446 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,744 | $100,000 | n/a |
MS0446 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,646 | $4,652 | n/a |
MS0446 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,927 | $24,500 | n/a |
UW2503 # 01 Y:2025 | 01 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $22,742 | $12,849 | n/a |
UW2503 # 02 Y:2025 | 02 | 2025 | INSULATE FEEDWATER TANK | $1,063 | $489 | n/a |
UW2503 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,132 | $25,000 | n/a |
UW2503 # 04 Y:2025 | 04 | 2025 | IMPROVE COMBUSTION CONTROL CAPABILITY | $52,839 | $2,112 | n/a |
UW2503 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $19,848 | $210,600 | n/a |
SU0571 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,987 | $0 | n/a |
SU0571 # 02 Y:2025 | 02 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,187 | $0 | n/a |
SU0571 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,170 | $0 | n/a |
SU0571 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,489 | $632 | n/a |
SU0571 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,385 | $320 | n/a |
SU0571 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $512 | $418 | n/a |
SU0571 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $264 | $824 | n/a |
SU0571 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $672 | $2,129 | n/a |
SU0571 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $166 | $1,267 | n/a |
SU0571 # 10 Y:2025 | 10 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,560 | $1,856,682 | n/a |
UD1110 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,358 | $0 | n/a |