IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,763

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0476 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $65,373 $17,381 Not Implemented
AS0476 # 04 Y:2019 04 2019 RECOVER AND REUSE COOLING WATER $14,698 $7,484 Not Implemented
LS1908 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,210 $0 Implemented
LS1908 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,386 $25,000 Implemented
LS1908 # 03 Y:2019 03 2019 INSTALL SKYLIGHTS $22,426 $12,600 Not Implemented
LS1908 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,396 $21,120 Implemented
LS1908 # 05 Y:2019 05 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $46,800 $30,000 Implemented
LS1908 # 06 Y:2019 06 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $257,815 $4,915,152 Not Implemented
UK1904 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,228 $3,681 n/a
UK1904 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $0 n/a
UK1904 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,795 $14,400 n/a
UK1904 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,325 $243,934 n/a
UK1904 # 05 Y:2019 05 2019 INSTALL SKYLIGHTS $18,882 $84,800 n/a
UK1904 # 06 Y:2019 06 2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $364 $1,800 n/a
UK1904 # 07 Y:2019 07 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,714 $720 n/a
UK1904 # 08 Y:2019 08 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $64,369 $260,000 n/a
UK1904 # 09 Y:2019 09 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $854 $660 n/a
UK1904 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,940 $4,150 n/a
UK1904 # 11 Y:2019 11 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $828 $1,150 n/a
UK1904 # 12 Y:2019 12 2019 DIRECT WARMEST AIR TO COMBUSTION INTAKE $986 $3,960 n/a
UK1904 # 13 Y:2019 13 2019 INSULATE BARE EQUIPMENT $481 $419 n/a
UK1904 # 14 Y:2019 14 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,920 $180,000 n/a
UD0999 # 01 Y:2019 01 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,762 $0 Not Implemented
UD0999 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,453 $0 Implemented
UD0999 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $6,465 $596 Not Implemented