IAC logo
IAC Assessment: TT0236
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TT0236
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Tennessee Technological University
Assessment Year 2020
Principal Product Engine Valves
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 235
Plant Area (Sq.Ft.) 175,000
Annual Production 53,000,000 Pieces
Production Hrs. Annual 8,064
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $921,502 25,312,612 kWh $0.04
Electricity Demand $632,315 91,316 kW-months/year $6.92
Electricity Fees $78,000 - $ -
Natural Gas $194,739 21,962 MMBtu $8.87
TOTAL ENERGY COSTS $1,876,056
RECOMMENDED SAVINGS* $105,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,879
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Water Usage Electricity Usage Electricity Demand Electricity Fees Water Usage
$ kWh $ kW-months/year $ $ $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$28,173
Cost:
$90,000
- - - - $28,173 - - - -
-
kWh
-
-
kW-months/year
$28,173
-
$
-
-
Tgal
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$28,629
Cost:
$16,000
$(-203) (-5,564) $(-57) (-8) $28,889 - - - $(-203)
(-5,564)
kWh
$(-57)
(-8)
kW-months/year
$28,889
-
$
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,250
Cost:
$128,083
$15,165 416,620 $5,085 703 - - - - $15,165
416,620
kWh
$5,085
703
kW-months/year
-
-
$
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,754
Cost:
$2,700
$6,498 178,507 $2,256 326 - - - - $6,498
178,507
kWh
$2,256
326
kW-months/year
-
-
$
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,447
Cost:
$15,750
$6,370 175,000 $2,077 300 - - - - $6,370
175,000
kWh
$2,077
300
kW-months/year
-
-
$
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,574
Cost:
$40
$6,574 180,600 - - - - - - $6,574
180,600
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
07: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$1,908
Cost:
$500
$1,908 52,429 - - - - - - $1,908
52,429
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,653
Cost:
$2,150
- - - - - - $1,653 86,520 -
-
kWh
-
-
kW-months/year
-
-
$
$1,653
86,520
Tgal
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$984
Cost:
$1,500
$984 27,025 - - - - - - $984
27,025
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$206
Cost:
$450
$153 4,210 $53 8 - - - - $153
4,210
kWh
$53
8
kW-months/year
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$105,579
Cost:
$257,173
$37,450 1,028,827 $9,414 1,328 $57,062 - $1,653 86,520 $37,450
1,028,827
kWh
$9,414
1,328
kW-months/year
$57,062
-
$
$1,653
86,520
Tgal
TOTAL IMPLEMENTED Savings:
$48,879
Cost:
$144,083
$14,963 411,056 $5,028 695 $28,889 - - - $14,963
411,056
kWh
$5,028
695
kW-months/year
$28,889
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Water Usage Electricity Usage Electricity Demand Electricity Fees Water Usage