Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
303
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0802 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,918 | $2,775 | Implemented |
OK0802 # 10 Y:2010 | 10 | 2010 | COMBINE UTILITY METERS | $936 | $175 | Implemented |
OK0802 # 09 Y:2010 | 09 | 2010 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,625 | $0 | Implemented |
OK0802 # 03 Y:2010 | 03 | 2010 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,477 | $2,599 | Not Implemented |
OK0802 # 01 Y:2010 | 01 | 2010 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,017 | $6,215 | Not Implemented |
OK0802 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $1,998 | $13,149 | Implemented |
OK0802 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,400 | $1,550 | Implemented |
OK0802 # 05 Y:2010 | 05 | 2010 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $11,414 | $51,875 | Implemented |
OK0802 # 08 Y:2010 | 08 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $23,800 | $15,600 | Implemented |
OK0802 # 07 Y:2010 | 07 | 2010 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $30,411 | $45,000 | Implemented |
OK0801 # 11 Y:2010 | 11 | 2010 | OPTIMIZE PLANT POWER FACTOR | $669 | $9,307 | Not Implemented |
OK0801 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $547 | $1,658 | Not Implemented |
OK0801 # 01 Y:2010 | 01 | 2010 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $6,511 | $78,169 | Implemented |
OK0801 # 06 Y:2010 | 06 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $523 | $516 | Not Implemented |
OK0801 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,015 | $2,017 | Not Implemented |
OK0801 # 03 Y:2010 | 03 | 2010 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $9,699 | $3,000 | Implemented |
OK0801 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $995 | $2,625 | Implemented |
OK0801 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,205 | $660 | Not Implemented |
OK0801 # 10 Y:2010 | 10 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,069 | $14,336 | Not Implemented |
OK0801 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $299 | $201 | Not Implemented |
OK0801 # 12 Y:2010 | 12 | 2010 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $4,196 | $21,075 | Implemented |
OK0801 # 02 Y:2010 | 02 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,599 | $34,948 | Implemented |
MI0198 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,683 | $55,919 | Implemented |
MI0198 # 08 Y:2010 | 08 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,407 | $40 | Implemented |
MI0198 # 06 Y:2010 | 06 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,870 | $1,210 | Implemented |