IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

298

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0175 # 09 Y:2016 09 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,155 $200 Implemented
TT0175 # 08 Y:2016 08 2016 USE OPTIMUM THICKNESS INSULATION $1,726 $375 Not Implemented
TT0175 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,832 $2,400 Not Implemented
TT0175 # 06 Y:2016 06 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,374 $400 Implemented
TT0175 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,500 $6,820 Not Implemented
TT0175 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,579 $23,120 Not Implemented
TT0175 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,213 $25 Implemented
TT0175 # 02 Y:2016 02 2016 UPGRADE CONTROLS ON COMPRESSORS $12,631 $125 Implemented
TT0175 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $40,909 $94,503 Not Implemented
SD0531 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,145 $850 Not Implemented
SD0531 # 07 Y:2016 07 2016 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,177 $305 Not Implemented
SD0531 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,174 $2,000 Implemented
SD0531 # 02 Y:2016 02 2016 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,588 $3,308 Implemented
SD0531 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,781 $24,125 Implemented
SD0531 # 04 Y:2016 04 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,855 $6,757 Not Implemented
SD0531 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $2,137 $4,625 Not Implemented
SD0531 # 05 Y:2016 05 2016 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,169 $11,200 Not Implemented
NC0568 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,342 $100 Not Implemented
NC0568 # 10 Y:2016 10 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,240 $100,000 Not Implemented
NC0568 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,551 $78,500 Not Implemented
NC0568 # 08 Y:2016 08 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,890 $25,230 Not Implemented
NC0568 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,081 $200 Implemented
NC0568 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $2,121 $3,123 Not Implemented
NC0568 # 07 Y:2016 07 2016 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $10,217 $33,300 Not Implemented
NC0568 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,495 $22,028 Not Implemented