Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
335
matching recommendationsNAICS | 3361 | Motor Vehicle Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0226 # 10 Y:2012 | 10 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $922 | $80 | Implemented |
MI0226 # 11 Y:2012 | 11 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $656 | $3,010 | Implemented |
SU0320 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,185 | $0 | Not Implemented |
SU0320 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $7,403 | $5,019 | Not Implemented |
SU0320 # 03 Y:2012 | 03 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $18,749 | $42,038 | Not Implemented |
SU0320 # 04 Y:2012 | 04 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $391 | $1,332 | Not Implemented |
SU0320 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,671 | $37,046 | Not Implemented |
SU0320 # 06 Y:2012 | 06 | 2012 | MAKE A NEW BY-PRODUCT | $21,685 | $100,000 | Not Implemented |
SU0320 # 07 Y:2012 | 07 | 2012 | ELIMINATE/REDUCE AN OPERATION | $2,644 | $15,840 | Not Implemented |
UMS002 # 01 Y:2012 | 01 | 2012 | INSULATE BARE EQUIPMENT | $1,300 | $1,000 | Not Implemented |
UMS002 # 02 Y:2012 | 02 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $67,000 | $50,000 | Not Implemented |
LE0327 # 01 Y:2011 | 01 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $92,227 | $175,000 | Implemented |
LE0327 # 02 Y:2011 | 02 | 2011 | REPLACE BOILER | $91,620 | $240,000 | Not Implemented |
LE0327 # 03 Y:2011 | 03 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $61,378 | $125 | Implemented |
LE0327 # 04 Y:2011 | 04 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,335 | $94,400 | Not Implemented |
LE0327 # 05 Y:2011 | 05 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $15,778 | $2,102 | Not Implemented |
LE0327 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $5,653 | $7,280 | Not Implemented |
LE0327 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,286 | $1,900 | Implemented |
LE0327 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $360 | $400 | Not Implemented |
DL0073 # 01 Y:2011 | 01 | 2011 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $904,000 | $2,850,000 | Not Implemented |
DL0073 # 02 Y:2011 | 02 | 2011 | REPLACE BOILER | $420,000 | $408,000 | Not Implemented |
DL0073 # 03 Y:2011 | 03 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $19,700 | $6,400 | Not Implemented |
UA0061 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $223,288 | $22,500 | Implemented |
UA0061 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $224,396 | $387,720 | Not Implemented |
UA0061 # 03 Y:2011 | 03 | 2011 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,256 | $85,000 | Not Implemented |