IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 336112 Light Truck and Utility Vehicle Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0174 # 03 Y:2017 03 2017 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $49,747 $100,000 Not Implemented
UA0174 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,405 $588 Implemented
UA0174 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $435,778 $988,290 Not Implemented
UA0174 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $221 $564 Implemented
UA0174 # 05 Y:2017 05 2017 USE OPTIMUM TEMPERATURE $33,738 $8,460 Implemented
UA0174 # 06 Y:2017 06 2017 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $826 $2,820 Implemented
UA0174 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,033 $42,204 Not Implemented
MI0228 # 03 Y:2012 03 2012 INSTALL SKYLIGHTS $4,816 $8,484 Not Implemented
MI0228 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,686 $80 Implemented
MI0228 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,095 $160 Implemented
MI0228 # 05 Y:2012 05 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,303 $80 Implemented
MI0228 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,387 $1,400 Implemented
MI0228 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,589 $24,600 Implemented
MI0228 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,388 $1,660 Implemented
MI0226 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $3,010 Implemented
MI0226 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $922 $80 Implemented
MI0226 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,502 $80 Implemented
MI0226 # 01 Y:2012 01 2012 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $23,380 $25,234 Not Implemented
MI0226 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,579 $1,660 Implemented
MI0226 # 07 Y:2012 07 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,519 $11,300 Not Implemented
MI0226 # 06 Y:2012 06 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,409 $80 Implemented
MI0226 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,132 $1,400 Implemented
MI0226 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,310 $1,660 Implemented
MI0226 # 03 Y:2012 03 2012 INSTALL SKYLIGHTS $7,706 $13,800 Implemented
MI0226 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,340 $39,360 Implemented