Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
627
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0128 # 02 Y:2013 | 02 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,584 | $0 | Implemented |
MZ0128 # 03 Y:2013 | 03 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,679 | $0 | Not Implemented |
MZ0128 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,270 | $400 | Implemented |
MZ0128 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,891 | $1,160 | Implemented |
MZ0128 # 06 Y:2013 | 06 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,045 | $150 | Implemented |
MZ0128 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $218 | $190 | Implemented |
MZ0128 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $418 | $1,000 | Implemented |
MZ0128 # 09 Y:2013 | 09 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $717 | $2,000 | Implemented |
UM0431 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $25,011 | $30,000 | Implemented |
UM0431 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,730 | $38,000 | Not Implemented |
UM0431 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,100 | $200 | Not Implemented |
UM0431 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,832 | $2,500 | Not Implemented |
MZ0125 # 01 Y:2013 | 01 | 2013 | INSTALL OCCUPANCY SENSORS | $1,108 | $480 | Implemented |
MZ0125 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,168 | $9,300 | Implemented |
MZ0125 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,107 | $1,300 | Implemented |
UA0095 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,807 | $4,500 | Not Implemented |
UA0095 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,789 | $800 | Not Implemented |
UA0095 # 03 Y:2013 | 03 | 2013 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $18,583 | $59,040 | Not Implemented |
UA0095 # 04 Y:2013 | 04 | 2013 | DISCONNECT BALLASTS | $573 | $324 | Not Implemented |
UA0095 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $562 | $1,759 | Not Implemented |
UM0418 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $795,000 | $1,715,000 | Not Implemented |
UM0418 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,459 | $84,630 | Implemented |
UM0418 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $151,000 | $60,000 | Not Implemented |
UM0418 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,257 | $7,500 | Not Implemented |
BS0007 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,790 | $4,911 | Not Implemented |