Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0356 # 08 Y:2023 | 08 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,202 | $7,540 | Not Implemented |
MZ0356 # 09 Y:2023 | 09 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $10,677 | $100,000 | Not Implemented |
MZ0356 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $135,000 | $306,035 | Not Implemented |
MZ0356 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $525,252 | $3,450,533 | Not Implemented |
MZ0356 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,120 | $2,680 | Implemented |
MZ0356 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,117 | $14,802 | Implemented |
MZ0356 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,176 | $63,400 | Not Implemented |
MZ0356 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,731 | $440 | Not Implemented |
MZ0356 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $519 | $415 | Implemented |
MZ0221 # 03 Y:2017 | 03 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,574 | $100 | Implemented |
MZ0221 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,974 | $0 | Implemented |
MZ0221 # 04 Y:2017 | 04 | 2017 | INSTALL OCCUPANCY SENSORS | $1,286 | $2,350 | Implemented |
MZ0221 # 02 Y:2017 | 02 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,200 | $0 | Implemented |
MZ0221 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,101 | $1,160 | Implemented |
MZ0175 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $3,987 | $14,400 | Not Implemented |
MZ0175 # 04 Y:2015 | 04 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,198 | $0 | Not Implemented |
MZ0175 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $953 | $1,500 | Not Implemented |
MZ0175 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $1,344 | $1,800 | Not Implemented |
MZ0175 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,580 | $25,425 | Not Implemented |
MZ0128 # 02 Y:2013 | 02 | 2013 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,584 | $0 | Implemented |
MZ0128 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,270 | $400 | Implemented |
MZ0128 # 03 Y:2013 | 03 | 2013 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,679 | $0 | Not Implemented |
MZ0128 # 06 Y:2013 | 06 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,045 | $150 | Implemented |
MZ0128 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,032 | $90,880 | Implemented |
MZ0128 # 05 Y:2013 | 05 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,891 | $1,160 | Implemented |