Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 3362 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0177 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,090 | $2,850 | Implemented |
WM0177 # 05 Y:2022 | 05 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,483 | $1,650 | Not Implemented |
WM0177 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,560 | $0 | Not Implemented |
WM0177 # 03 Y:2022 | 03 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $1,573 | $4,352 | Not Implemented |
WM0177 # 02 Y:2022 | 02 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,032 | $2,040 | Implemented |
WM0177 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,014 | $0 | Implemented |
IC0129 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,611 | $1,035 | Implemented |
IC0129 # 08 Y:2007 | 08 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,264 | $0 | Implemented |
IC0129 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $506 | $1,782 | Implemented |
IC0129 # 06 Y:2007 | 06 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,946 | $2,902 | Implemented |
IC0129 # 05 Y:2007 | 05 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $561 | $0 | Implemented |
IC0129 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,613 | $22,008 | Implemented |
IC0129 # 03 Y:2007 | 03 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,183 | $4,040 | Not Implemented |
IC0129 # 01 Y:2007 | 01 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $14,537 | $81,554 | Implemented |
WI0522 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $69,304 | $182,880 | Implemented |
WI0522 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $14,000 | $3,000 | Implemented |
WI0522 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,607 | $2,000 | Implemented |
WI0522 # 04 Y:2006 | 04 | 2006 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,457 | $3,000 | Not Implemented |
WI0522 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,685 | $1,920 | Implemented |
WI0522 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,544 | $0 | Implemented |
WI0522 # 07 Y:2006 | 07 | 2006 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $4,560 | $12,105 | Not Implemented |