IAC logo
IAC Assessment: WI0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2006
Principal Product Truck Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $100,000,000-$500,000,000
# of Employees 800
Plant Area (Sq.Ft.) 660,000
Annual Production 11,500 Pieces
Production Hrs. Annual 4,125
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $355,274 10,298,400 kWh $0.03
Electricity Demand $204,749 26,289 kW-months/year $7.79
Natural Gas $271,117 25,970 MMBtu $10.44
TOTAL ENERGY COSTS $831,140
RECOMMENDED SAVINGS* $120,157 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $108,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$69,304
Cost:
$182,880
$41,816 1,155,144 $27,488 3,360 - - - - - - $41,816
1,155,144
kWh
$27,488
3,360
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$14,000
Cost:
$3,000
- - - - - - - - $14,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$14,000
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,607
Cost:
$2,000
- - - - $12,607 1,208 - - - - -
-
kWh
-
-
kW-months/year
$12,607
1,208
MMBtu
-
-
gal
-
-
$
04: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$7,457
Cost:
$3,000
- - - - $7,457 714 - - - - -
-
kWh
-
-
kW-months/year
$7,457
714
MMBtu
-
-
gal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$6,685
Cost:
$1,920
$2,889 79,796 $3,796 464 - - - - - - $2,889
79,796
kWh
$3,796
464
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,544
Cost:
-
$3,482 96,164 $2,542 311 - - - - $(-480) - $3,482
96,164
kWh
$2,542
311
kW-months/year
-
-
MMBtu
-
-
gal
$(-480)
-
$
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$4,560
Cost:
$12,105
- - - - - - $4,560 4,950 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,560
4,950
gal
-
-
$
TOTAL RECOMMENDED Savings:
$120,157
Cost:
$204,905
$48,187 1,331,104 $33,826 4,135 $20,064 1,922 $4,560 4,950 $13,520 - $48,187
1,331,104
kWh
$33,826
4,135
kW-months/year
$20,064
1,922
MMBtu
$4,560
4,950
gal
$13,520
-
$
TOTAL IMPLEMENTED Savings:
$108,140
Cost:
$189,800
$48,187 1,331,104 $33,826 4,135 $12,607 1,208 - - $13,520 - $48,187
1,331,104
kWh
$33,826
4,135
kW-months/year
$12,607
1,208
MMBtu
-
-
gal
$13,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes