Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
42
matching recommendationsNAICS | 33621 | Motor Vehicle Body and Trailer Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0418 # 01 Y:2012 | 01 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $795,000 | $1,715,000 | Not Implemented |
UM0418 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,459 | $84,630 | Implemented |
UM0418 # 03 Y:2012 | 03 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $151,000 | $60,000 | Not Implemented |
UM0418 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,257 | $7,500 | Not Implemented |
BS0007 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,790 | $4,911 | Not Implemented |
BS0007 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $186 | $300 | Not Implemented |
BS0007 # 05 Y:2012 | 05 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,845 | $6,260 | Not Implemented |
BS0007 # 06 Y:2012 | 06 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,204 | $7,725 | Not Implemented |
BS0007 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,760 | $649 | Implemented |
BS0007 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $98 | $0 | Not Implemented |
OK0829 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $346 | $954 | Not Implemented |
OK0829 # 10 Y:2012 | 10 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $8,164 | $17,500 | Not Implemented |
OK0829 # 09 Y:2012 | 09 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,966 | $80,748 | Not Implemented |
OK0829 # 08 Y:2012 | 08 | 2012 | INSTALL SET-BACK TIMERS | $3,516 | $489 | Not Implemented |
OK0829 # 07 Y:2012 | 07 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,159 | $417 | Implemented |
OK0829 # 06 Y:2012 | 06 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,221 | $7,540 | Not Implemented |
OK0829 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $202 | $1,139 | Not Implemented |
OK0829 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,968 | $260,400 | Not Implemented |
OK0829 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,959 | $33,990 | Not Implemented |
OK0829 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,021 | $1,600 | Implemented |
UM0405 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,465 | $1,400 | Implemented |
UM0405 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,384 | $2,000 | Not Implemented |
UM0404 # 04 Y:2012 | 04 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,767 | $36,000 | Not Implemented |
UM0404 # 03 Y:2012 | 03 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,071 | $10 | Not Implemented |
UM0404 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,960 | $200 | Not Implemented |