Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
231
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0195 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $9,989 | $0 | n/a |
IP0195 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $473 | $628 | n/a |
IP0191 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,225 | $8,610 | n/a |
IP0191 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $18,779 | $0 | n/a |
IP0191 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $428 | $1,099 | n/a |
IP0191 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,730 | $735 | n/a |
IP0191 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $4,978 | $384 | n/a |
IP0191 # 07 Y:2024 | 07 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,739 | $13,340 | n/a |
IP0191 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $87,660 | $91,077 | n/a |
IP0191 # 05 Y:2024 | 05 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,226 | $984 | n/a |
IP0190 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,129 | $0 | n/a |
IP0190 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,176 | $60 | n/a |
IP0190 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,128 | $4,817 | n/a |
IP0190 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,809 | $0 | n/a |
IP0190 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,195 | $0 | n/a |
IP0190 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,572 | $559 | n/a |
IP0190 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,876 | $11,711 | n/a |
IP0190 # 09 Y:2024 | 09 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $1,750 | $1,800 | n/a |
IP0190 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,672 | $10,914 | n/a |
IP0182 # 05 Y:2023 | 05 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,173 | $6,828 | Not Implemented |
IP0182 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $203 | $172 | Not Implemented |
IP0182 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $950 | $1,284 | Not Implemented |
IP0182 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,891 | $50 | Not Implemented |
IP0182 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $0 | Not Implemented |
IP0171 # 04 Y:2023 | 04 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $261 | $38 | Not Implemented |