IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,360

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0324 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $65,010 $664,200 Not Implemented
UA0248 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,182 $9,020 Implemented
UA0248 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,679 $2,002 Implemented
UA0248 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $100 Not Implemented
UA0248 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $274 Implemented
IP0151 # 01 Y:2021 01 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $759 $18 Implemented
IP0151 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,626 $271 Implemented
IP0151 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,159 $767 Implemented
IP0151 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,612 $34,884 Implemented
IP0151 # 05 Y:2021 05 2021 REPLACE BOILER $26,645 $57,558 Implemented
UD1031 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,133 $5,000 Not Implemented
UD1031 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,382 $0 Implemented
UD1031 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,188 $676 Implemented
UD1031 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,863 $10,000 Not Implemented
UD1031 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,586 $0 Implemented
UD1031 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $31,642 $15,000 Not Implemented
UD1031 # 07 Y:2022 07 2022 COVER OPEN TANKS $7,338 $15,000 Not Implemented
UD1031 # 08 Y:2022 08 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $30,918 $30,918 Not Implemented
UD1031 # 09 Y:2022 09 2022 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $6,625 $5,000 Not Implemented
UD1031 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,888 $23,132 Not Implemented
UD1031 # 11 Y:2022 11 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $909 $0 Implemented
UD1031 # 12 Y:2022 12 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,847 $1,000 Not Implemented
UD1031 # 13 Y:2022 13 2022 OPTIMIZE PLANT POWER FACTOR $1,446 $4,227 Not Implemented
UD1031 # 14 Y:2022 14 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,264 $7,500 Not Implemented
UD1031 # 15 Y:2022 15 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,659 $7,500 Not Implemented