Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
231
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0201 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,678 | $1,198 | n/a |
IP0201 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,237 | $2,101 | n/a |
IP0201 # 02 Y:2024 | 02 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,654 | $0 | n/a |
IP0201 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $3,904 | $700 | n/a |
IP0201 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,084 | $0 | n/a |
IP0201 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,830 | $25,000 | n/a |
IP0201 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,991 | $1,471 | n/a |
IP0201 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $133,638 | $39,257 | n/a |
IP0200 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,451 | $75 | n/a |
IP0200 # 04 Y:2024 | 04 | 2024 | INSTALL SUB-METERING EQUIPMENT | $170,944 | $700 | n/a |
IP0200 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,593 | $0 | n/a |
IP0200 # 09 Y:2024 | 09 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $11,682 | $7,629 | n/a |
IP0200 # 11 Y:2024 | 11 | 2024 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $335 | $705 | n/a |
IP0200 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,999 | $1,899 | n/a |
IP0200 # 07 Y:2024 | 07 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,262 | $328 | n/a |
IP0200 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,977 | $921 | n/a |
IP0200 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,456 | $0 | n/a |
IP0200 # 08 Y:2024 | 08 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,218 | $4,577 | n/a |
IP0200 # 10 Y:2024 | 10 | 2024 | COVER OPEN TANKS | $129 | $246 | n/a |
IP0195 # 06 Y:2024 | 06 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $97,675 | $217,296 | n/a |
IP0195 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $2,446 | $10,400 | n/a |
IP0195 # 03 Y:2024 | 03 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,465 | $0 | n/a |
IP0195 # 08 Y:2024 | 08 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $37,878 | $224,750 | n/a |
IP0195 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $9,989 | $0 | n/a |
IP0195 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $473 | $628 | n/a |