IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
NAICS 3363 Motor Vehicle Parts Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0321 # 09 Y:2025 09 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,797 $3,000 n/a
TT0321 # 10 Y:2025 10 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $1,536 $0 n/a
TT0321 # 07 Y:2025 07 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,896 $1,450 n/a
TT0321 # 01 Y:2025 01 2025 USE SOLAR HEAT FOR HEAT $71,296 $345,600 n/a
TT0321 # 11 Y:2025 11 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,173 $0 n/a
TT0321 # 13 Y:2025 13 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $584 $1,125 n/a
TT0321 # 12 Y:2025 12 2025 MINIMIZE WATER USAGE $830 $0 n/a
TT0321 # 02 Y:2025 02 2025 OPTIMIZE PLANT POWER FACTOR $28,035 $28,125 n/a
TT0321 # 08 Y:2025 08 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,076 $645 n/a
TT0321 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,906 $3,825 n/a
TT0321 # 05 Y:2025 05 2025 RECOVER WASTE HEAT FROM EQUIPMENT $10,097 $10,000 n/a
TT0321 # 03 Y:2025 03 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,594 $2,250 n/a
TT0321 # 04 Y:2025 04 2025 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,473 $10,000 n/a
TT0292 # 01 Y:2023 01 2023 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $28,974 $250 Not Implemented
TT0292 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,314 $15,941 Implemented
TT0292 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,900 $600 Not Implemented
TT0292 # 03 Y:2023 03 2023 AIR CONDITION ONLY SPACE NECESSARY $8,884 $18,000 Implemented
TT0292 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,268 $50 Implemented
TT0292 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,004 $4,240 Not Implemented
TT0292 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,057 $2,190 Implemented
TT0292 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,223 $4,750 Implemented
TT0284 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,705 $50,300 Not Implemented
TT0284 # 02 Y:2023 02 2023 MINIMIZE WATER USAGE $10,675 $240 Implemented
TT0284 # 08 Y:2023 08 2023 OPTIMIZE PLANT POWER FACTOR $2,266 $3,750 Not Implemented
TT0284 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $60 Not Implemented