Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0061 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $393 | $580 | n/a |
MU0061 # 07 Y:2024 | 07 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $2,592 | $10,260 | n/a |
MU0061 # 09 Y:2024 | 09 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $370 | $1,608 | n/a |
MU0061 # 04 Y:2024 | 04 | 2024 | INSTALL SET-BACK TIMERS | $24,478 | $160,704 | n/a |
MU0061 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $246 | $339 | n/a |
MU0061 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89 | $114 | n/a |
MU0061 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,468 | $4,140 | n/a |
MU0061 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,426 | $12,734 | n/a |
MU0061 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $0 | n/a |
WV0673 # 13 Y:2024 | 13 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $177 | $688 | n/a |
WV0673 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $4,399 | $2,317 | n/a |
WV0673 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $55,596 | $232,663 | n/a |
WV0673 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,359 | $6,620 | n/a |
WV0673 # 07 Y:2024 | 07 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,917 | $5,832 | n/a |
WV0673 # 08 Y:2024 | 08 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,740 | $1,420 | n/a |
WV0673 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $6,139 | $11,569 | n/a |
WV0673 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $20,643 | $75,157 | n/a |
WV0673 # 11 Y:2024 | 11 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $470 | $887 | n/a |
WV0673 # 09 Y:2024 | 09 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $620 | $560 | n/a |
WV0673 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,382 | $16,575 | n/a |
WV0673 # 12 Y:2024 | 12 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $179 | $80 | n/a |
WV0673 # 10 Y:2024 | 10 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $613 | $3,000 | n/a |
TR0059 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $148,771 | $739,065 | n/a |
TR0059 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $5,966 | $1,570 | n/a |
TR0059 # 03 Y:2024 | 03 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $18,395 | $4,000 | n/a |