Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 33633 | Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $627 | $792 | Implemented |
MU0027 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,030 | $0 | Implemented |
MU0027 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $42 | $0 | Implemented |
MU0027 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23 | $24 | Implemented |
MU0027 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,992 | $0 | Implemented |
MU0027 # 07 Y:2023 | 07 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,660 | $0 | Implemented |
MU0027 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,266 | $9,146 | Implemented |
MU0027 # 01 Y:2023 | 01 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $12,446 | $0 | Implemented |
UM0327 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $561 | $275 | Implemented |
UM0327 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,516 | $1,000 | Implemented |
UM0327 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,123 | $9,375 | Implemented |
UM0320 # 02 Y:2007 | 02 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $19,072 | $0 | Implemented |
UM0320 # 04 Y:2007 | 04 | 2007 | REVISE SMOKE CLEANUP FROM OPERATIONS | $11,829 | $1,846 | Implemented |
UM0320 # 05 Y:2007 | 05 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,797 | $0 | Implemented |
UM0320 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $10,572 | $19,721 | Implemented |
UM0320 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,938 | $500 | Implemented |
UM0320 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,982 | $825 | Implemented |
UM0320 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,603 | $20 | Implemented |
UM0320 # 10 Y:2007 | 10 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $4,703 | $1 | Implemented |
UM0320 # 11 Y:2007 | 11 | 2007 | DISCONNECT BALLASTS | $3,782 | $0 | Implemented |
UM0320 # 12 Y:2007 | 12 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,510 | $80 | Implemented |
UM0320 # 13 Y:2007 | 13 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $900 | $100 | Implemented |
UM0273 # 05 Y:2005 | 05 | 2005 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $897 | $420 | Implemented |
UM0273 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,373 | $3,897 | Implemented |
UM0273 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,256 | $975 | Implemented |