Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 33633 | Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $627 | $792 | Implemented |
MU0027 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,030 | $0 | Implemented |
MU0027 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $42 | $0 | Implemented |
MU0027 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23 | $24 | Implemented |
MU0027 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,992 | $0 | Implemented |
MU0027 # 07 Y:2023 | 07 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,660 | $0 | Implemented |
MU0027 # 08 Y:2023 | 08 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,266 | $9,146 | Implemented |
MU0027 # 09 Y:2023 | 09 | 2023 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,480 | $6,400 | Not Implemented |
MU0027 # 01 Y:2023 | 01 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $12,446 | $0 | Implemented |
UM0327 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,637 | $2,140 | Not Implemented |
UM0327 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $18,136 | $9,406 | Not Implemented |
UM0327 # 03 Y:2007 | 03 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $9,041 | $6,735 | Not Implemented |
UM0327 # 05 Y:2007 | 05 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,516 | $1,000 | Implemented |
UM0327 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,123 | $9,375 | Implemented |
UM0327 # 07 Y:2007 | 07 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $981 | $1,000 | Not Implemented |
UM0327 # 09 Y:2007 | 09 | 2007 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $416 | $780 | Not Implemented |
UM0327 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $561 | $275 | Implemented |
UM0327 # 06 Y:2007 | 06 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,955 | $787 | Not Implemented |
UM0320 # 07 Y:2007 | 07 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,938 | $500 | Implemented |
UM0320 # 05 Y:2007 | 05 | 2007 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,797 | $0 | Implemented |
UM0320 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $10,572 | $19,721 | Implemented |
UM0320 # 12 Y:2007 | 12 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,510 | $80 | Implemented |
UM0320 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,982 | $825 | Implemented |
UM0320 # 10 Y:2007 | 10 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $4,703 | $1 | Implemented |
UM0320 # 11 Y:2007 | 11 | 2007 | DISCONNECT BALLASTS | $3,782 | $0 | Implemented |