IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 336330 Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0209 # 01 Y:2018 01 2018 CLEAN CONDENSER TUBES $14,316 $600 Implemented
TT0209 # 11 Y:2018 11 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $465 Implemented
TT0209 # 10 Y:2018 10 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $755 $2,000 Not Implemented
TT0209 # 09 Y:2018 09 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,382 $1,000 Not Implemented
TT0209 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $5,280 Implemented
TT0209 # 07 Y:2018 07 2018 LEASE EQUIPMENT INSTEAD OF PURCHASING $3,120 $0 Not Implemented
TT0209 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,604 $3,500 Not Implemented
TT0209 # 05 Y:2018 05 2018 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,157 $0 Not Implemented
TT0209 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $6,114 $5,200 Not Implemented
TT0209 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,088 $2,000 Implemented
TT0209 # 02 Y:2018 02 2018 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $13,850 $17,000 Not Implemented
CL1801 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,074 $111,703 Not Implemented
CL1801 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,788 $2,080 Not Implemented
CL1801 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,775 $4,800 Not Implemented
CL1801 # 04 Y:2018 04 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $13,900 $22,500 Not Implemented
CL1801 # 03 Y:2018 03 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $25,853 $4,700 Not Implemented
CL1801 # 02 Y:2018 02 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $47,531 $15,500 Not Implemented
MA0787 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $660 $100 Implemented
MA0787 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,111 $100 Implemented
MA0787 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,796 $100 Implemented
MA0787 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,589 $100 Implemented
MA0787 # 01 Y:2018 01 2018 USE SOLAR HEAT FOR HEAT $76,722 $790,840 Not Implemented