IAC Assessment: CL1801
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CL1801
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Clemson University
Assessment Year 2018
Principal Product Shock Absorbers
NAICS 336330 - Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 400,000
Annual Production 7,500,000 Units
Production Hrs. Annual 8,760
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,571,566 25,204,206 kWh $0.06
Electricity Demand $17,263 2,877 kW-months/year $6.00
Natural Gas $486,187 114,226 MMBtu $4.26
TOTAL ENERGY COSTS $2,075,016
RECOMMENDED SAVINGS* $166,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$68,074
Cost:
$111,703
$59,744 957,442 $8,330 1,388 - - - - $59,744
957,442
kWh
$8,330
1,388
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$47,531
Cost:
$15,500
- - - - $47,531 11,157 - - -
-
kWh
-
-
kW-months/year
$47,531
11,157
MMBtu
-
-
Tgal
03: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$25,853
Cost:
$4,700
- - - - - - $25,853 10,771,944 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,853
10,771,944
Tgal
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$13,900
Cost:
$22,500
- - - - $13,900 3,263 - - -
-
kWh
-
-
kW-months/year
$13,900
3,263
MMBtu
-
-
Tgal
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,775
Cost:
$4,800
$8,637 138,408 $1,138 190 - - - - $8,637
138,408
kWh
$1,138
190
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,788
Cost:
$2,080
$1,580 25,316 $208 35 - - - - $1,580
25,316
kWh
$208
35
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$166,921
Cost:
$161,283
$69,961 1,121,166 $9,676 1,613 $61,431 14,420 $25,853 10,771,944 $69,961
1,121,166
kWh
$9,676
1,613
kW-months/year
$61,431
14,420
MMBtu
$25,853
10,771,944
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage