Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsNAICS | 336330 | Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1908 # 10 Y:2019 | 10 | 2019 | REDUCE FLUID FLOW RATES | $2,913 | $1,900 | Not Implemented |
UK1908 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $40,190 | $3,038 | Implemented |
UK1908 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $116,074 | $438,000 | Implemented |
UK1908 # 04 Y:2019 | 04 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $553 | $227 | Not Implemented |
UK1908 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,676 | $22,903 | Implemented |
UK1908 # 06 Y:2019 | 06 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,551 | $0 | Implemented |
UK1908 # 07 Y:2019 | 07 | 2019 | DISCONNECT BALLASTS | $383 | $72 | Implemented |
UK1908 # 08 Y:2019 | 08 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $914 | $720 | Not Implemented |
UK1908 # 09 Y:2019 | 09 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,838 | $1,900 | Implemented |
UK1908 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,319 | $0 | Implemented |
UK1908 # 11 Y:2019 | 11 | 2019 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,831 | $5,000 | Not Implemented |
UK1908 # 12 Y:2019 | 12 | 2019 | CLEAN CONDENSER TUBES | $15,832 | $7,858 | Implemented |
UK1908 # 13 Y:2019 | 13 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,547 | $8,300 | Implemented |
UK1908 # 14 Y:2019 | 14 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,671 | $2,684 | Not Implemented |
UK1908 # 15 Y:2019 | 15 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $63,247 | $2,368 | Implemented |
UK1908 # 16 Y:2019 | 16 | 2019 | INSULATE BARE EQUIPMENT | $13,639 | $18,226 | Not Implemented |
UK1908 # 17 Y:2019 | 17 | 2019 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $1,430 | $0 | Implemented |
UK1908 # 18 Y:2019 | 18 | 2019 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $21,879 | $28,230 | Not Implemented |
UD0997 # 10 Y:2019 | 10 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $66,439 | $164,220 | Implemented |
UD0997 # 01 Y:2019 | 01 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,924 | $0 | Implemented |
UD0997 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,364 | $0 | Implemented |
UD0997 # 03 Y:2019 | 03 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,727 | $7,000 | Not Implemented |
UD0997 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $60,472 | $17,300 | Not Implemented |
UD0997 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,400 | $27,000 | Not Implemented |
UD0997 # 06 Y:2019 | 06 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,359 | $2,540 | Not Implemented |